Joey and I were very fortunate to build a house. Here is the journey through pictures.
Broke ground March 10th, 2008.
The lot |
Making a muddy mess |
Footers are dug |
Footers are poured |
Block is started |
Block continues |
Block is almost done |
Floor trusses and subfloor is laid |
First wall |
The huge crawlspace |
2nd wall is up |
We have 4 walls! |
Front porch |
Back deck |
Roof trusses |
Dormers are built |
We have a roof! |
Heating and air unit is installed. |
Shingles and railings are complete with most windows in |
Back door and deck |
Back dormer and back deck are complete |
Insulation is installed |
Beautiful green siding |
Sheetrock is hung |
Painting begins (My mom and I painted the entire house with minimal help from Joey and my Aunt Bev. My mom is the best!) |
Murphy napped while we painted. |
Our resting spot |
The hall bath is blue |
Our bedroom is reddish |
Joey laid the entire wood floor. (I don't know why there are spots all over this picture.) |
Gorgeous |
Bedroom ceiling fan |
Hallway lights |
Kitchen cabinets delivered |
Steps nearing completion |
Hall bath tile floor |
Master bath tile floor |
Cabinets installed |
Matching bathroom cabinet |
Counter tops and dishwasher |
Front door and sconces |
Dining light |
Tile floor in shower |
Step railing complete |
Front walk laid out |
Kitchen sink and faucet |
Master bath sink and cabinet |
The kids visit after we're all moved in! |
Moved in August 9th, 2008!